for10-t

Forlì airport

OPERATIONS PERFORMED total Makeover runway for an extension in the length of 2.420 m. Construction of a parking space for aircraft to an area of 30.000 MQ. Reconstruction of the square in front of the Terminal for a surface of 8.000 MQ. Electrical installations and

amb-bkg

Noise Pollution

Modeling and simulation of NOISE for noise assessments using the CADNA software for calculating outdoor propagation of road traffic noise. The model makes the assessment of noise pollution due to vehicular traffic, based