for10-t

Forlì airport

OPERATIONS PERFORMED total Makeover runway for an extension in the length of 2.420 m. Construction of a parking space for aircraft to an area of 30.000 MQ. Reconstruction of the square in front of the Terminal for a surface of 8.000 MQ. Electrical installations and